New ACHD policies
Did you know that ACHD recently revised their Policy Manual? While meeting with staff about two new projects, I realized that section 7200 Technical Requirements was revised. At this time, it's difficult to determine what exactly was revised. It does appear that approach/access related requirements were drastically modified, including the number of approaches allowed and the spacing. Another change is the drainage requirements. These changes result from a drainage group created by ACHD (I was a volunteer, along with a few other knowledgeable private engineers) last year. The drainage changes, in my opinion, should not negatively impact your future projects.
Mason & Stanfield can prepare an approach and access plan for your project. We offer services throughout Ada County, including Boise, Meridian, Eagle, Star, Meridian, and Kuna.

